LAST CHANCE TO GET THE FULL 30% FEDERAL TAX CREDIT! ACT NOW TO SECURE YOUR SOLAR!
00
Days
00
Hours
00
Minutes
00
Seconds
Claim Your Savings Now
Blog Single Image
Solar News and Innovations

September 5, 2025

If your roof needs replacement or repair, you'll likely need your solar panels removed and reinstalled—often referred to as “Solar R&R.” In Southern California, where roofs and solar systems typically last 25-30 years, timing these replacements together can save you time, money, and stress. Below is a homeowner’s guide for making the process efficient and safe—plus how US Power makes it stress-free every step of the way.

Why Solar Panels Need to Be Temporarily Removed

Common reasons for removal include:

  • Roof Replacement or Upgrade – Roofing and solar systems often have similar life spans. Coordinating both eliminates redundant labor.
  • Storm or Weather Damage – Panels may be removed to repair wind, hail, or debris damage.
  • Home Remodeling or Expansion – Structural changes may require panels to be removed, repositioned, or redesigned for optimal sun exposure.

Never Attempt DIY—Why Professional Removal Matters

Removing solar panels is a job best left to experienced installers. DIY attempts can result in:

  • Safety Risks – Panels generate electricity when exposed to sunlight, and rooftop work requires proper training and safety gear.
  • Void Warranties – Both equipment and workmanship warranties often require licensed professionals for R&R processes.
  • Structural or System Damage – Mishandling can lead to broken glass, damaged wiring, or compromised system performance.

The Standard Removal & Reinstallation Process

A streamlined R&R includes these professional steps:

  1. System Diagnosis – Evaluating your system’s health before removal.
  2. Safe Disconnection – Power safely shut off and panels unmounted.
  3. Secure Storage – Panels stored properly to protect against damage.
  4. Roof Work Execution – All roofing repairs or replacement completed.
  5. Reinstallation & Inspection – Panels reinstalled, aligned, and tested for performance.
  6. Permits & Documentation – Electrical and roofing permits handled to ensure code compliance.

What Can It Cost?

Costs vary, often depending on panel counts, roof complexity, and local rates:

  • Per-panel R&R: Typically $200–$300 per panel, with full system R&R often ranging from $1,500 to $6,000.
  • Factors Influencing Cost:
    • Panel and mounting hardware replacement
    • Panel storage needs
    • Permitting and inspection fees
    • Roof type or steepness
    • Downtime from system deactivation—leading to temporary energy cost increases

Reddit users across California confirm typical quotes of $250–$300 per panel, with total projects sometimes exceeding $7,000 for larger arrays—or significantly lower in more budget-friendly circumstances.

US Power: Your Local, Solar and Roofing Partner

Choosing US Power ensures a seamless experience:

  • Integrated Roof & Solar Coordination – We align both services to minimize cost and downtime.
  • Professional Permitting & Documentation – Handled for smooth HOA and municipal compliance.
  • Careful Panel Handling – Panels are stored safely, protecting your investment and warranties.
  • Performance Verification – After reinstallation, we check that each panel is optimally positioned and functioning.
  • Transparent Quotes – No surprises—detailed upfront pricing and timelines.

Before deciding to remove or install additional solar panels, you should call an expert—it is risky to do yourself and potentially costly if mishandled. In Los Angeles where solar combines with roofing longevity, syncing these projects with a trusted provider like US Power keeps your system performing safely and your warranty intact.

Contact US Power today to schedule your free evaluation and get expert, local solar and roofing professionals on your side.

Blog Author Image
US POWER Team

Solar and Roofing Consultant

Team Social Icon 04Team Social Icon 02LinkedIn Icon DarkTeam Social Icon 03

Related Articles

Our Related Blogs

Blog Image
Solar News and Innovations

Sep 5, 2025

Can Your HOA Stop You from Going Solar?

California’s Solar Rights Act protects your right to install solar—even in HOA communities. Learn the 2025 rules, timelines, and tips from US Power.

Read More
Blog Image
Solar News and Innovations

Sep 5, 2025

How to Transfer Solar Ownership When Selling Your Home

Selling a Los Angeles home with solar panels? Discover how to hand over ownership and warranties seamlessly—US Power walks you through each step.

Read More

Get an instant solar estimate using satellite!