00
Days
00
Hours
00
Minutes
00
Seconds
Table of contents
-
Blog Single Image

The federal Residential Clean Energy Credit offers homeowners a valuable 30% tax deduction on the cost of a solar installation—but there's a critical deadline: December 31, 2025, after which this credit will no longer be available for residential systems.

At US Power, our factory-direct partnership with Qcells empowers us to expedite installation timelines, helping you lock in the full credit before it vanishes. Here's how we help you make it happen:

Why Timing—and Speed—Matters

Delaying your solar installation could mean missing out on thousands of dollars in tax savings. A delay in ordering, shipping, or installation risks pushing your project past the December 31, 2025 deadline, and that would mean no tax credit. Fast action is the only way to ensure you benefit fully.

Our Factory-Direct Advantage: Fast, Reliable, American-Made

Most solar firms must order panels through third-party distributors, which can lead to:

  • Inventory shortages or delays
  • Import-related shipping holdups
  • Middleman cost markups

By contrast, our direct access to Qcells’ U.S. manufacturing facility in Dalton, Georgia, gives us:

  1. Priority Inventory – Panels reserved and shipped to us, not sitting in distribution queues.
  2. Faster Local Delivery – No overseas shipping; local transit means quicker delivery.
  3. Scheduling Confidence – With equipment in-hand sooner, we can lock in your install dates swiftly.

This approach lets us complete most residential installations in just a few weeks—just in time to qualify for the full tax credit.

Quality You Can Count On

Rest assured, fast doesn’t mean rushed. Qcells panels are manufactured under industry-leading quality controls—including electroluminescence testing, thermal cycling, and performance verification—ensuring both performance and reliability for years to come.

By pairing speed with quality, we ensure you don’t have to choose between “getting it done fast” and “getting it done right.”

Streamlined Path from Contract to Claim

Here’s our process to get you solar—and into the tax credit—quickly:

  1. Free, personalized consultation to assess your eligibility and timeline.
  2. Custom system design aimed at efficiency and return on investment.
  3. Immediate equipment reservation through Qcells’ factory.
  4. Swift installation—typically completed within 1 to 3 days.
  5. Fast inspection and activation, so your system is online before the end of 2025.

Act Now or Miss Out

Waiting isn’t an option. Once the federal deadline passes, it’s passed forever. Even if the solar tax credit remains at 30% today, a delay could cost you thousands—or more.

Secure Your Full 30% Tax Credit with US Power and Qcells

With our factory-direct advantage, we make it possible for homeowners to install accounts before December 31, 2025—and claim the full 30% credit. Don’t let supply delays or scheduling bottlenecks cost you this incentive—every week counts.

Move quickly, and you’ll start saving on taxes—and electricity—before you know it.

Solar Basics & Guides

Published

August 14, 2025

Team Social Icon 04Team Social Icon 02LinkedIn Icon DarkTeam Social Icon 03

Related Articles

Our Related Blogs

Blog Image
Solar News and Innovations
Huge Change For Residential Solar Systems

Residential solar technology is shifting fast with updates homeowners must know now.

Read More
Blog Image
Solar News and Innovations
Things You MUST KNOW Before Going Solar in California

California rules, incentives, and savings make solar a smart move for homeowners.

Read More
Blog Image
Solar Costs & Savings
How Much Are California Homeowners Paying for Electricity

See current electricity costs and what California homeowners has to pay monthly.

Read More

Get an instant solar estimate using satellite!